Prefabricated steel structure poultry/house/car port/warehouse/workshop

Prefabricated Steel Structure Hangar/Chick Shed/Car Port/Ware House/WorkshopLight steel structure workshops or ware house are made of welded or hot rolled H section steel as columns and beams, C section steel as wall purlin and roof purlin, some of which have overhead crane. Owing to Many advantages, light steel structure worksh

Featured Products

Prefabricated Steel Structure Hangar/Chick Shed/Car Port/Ware House/Workshop

Light steel structure workshops or ware house are made of welded or hot rolled H section steel as columns and beams, C section steel as wall purlin and roof purlin, some of which have overhead crane. Owing to Many advantages, light steel structure workshops are more and more widely used all over the world.

Advantages:

 
1. Environmental friendly
2. Cost efficient and quick to build
3. Long life-span without maintenance up to 50 years
4. Stable and can resist at least 8 grade earthquake
 

Name

steel structure buildings (warehouse/Hangar/Poultry House/ Livestock Hose etc)

Material

Steel (Q235B,Q345B)

Main frame

 C Purlin, Channel Steel, Square Pipe

Roof and wall

a) Color-coated corrugated steel sheet;

b) Rock Wool Sandwich Panels;

c) EPS Sandwich Panels;

d)Glass wool Sandwich Panels

Door

a)Rolling Gate;

b) Sliding door

Window

PVC Steel or Aluminum Alloy

Down spout

Round pvc pipe

Usage

Can be used as

Carport,Hotel,House,Kiosk booth,Office,Sentry Box,

Guard House,Shop,

Toilet,Villa,

Warehouse, Poultry House, Livestock House, Workshop, Plant


Steel Structure Mystems:
1. Main steel structure includes steel beams and steel columns.Both of them made of section steel.

The surface treatment could be galvanized or painted .They are loaded in containers separated,then joint together at the building site with high strength bolts.

2.Sub-structure system includes purlin,usually c/z purlin,bracing,tie bar and knee brace.

The surface treatment could be galvanized or painted .They are loaded in containers separated,then joint together at the building site with general bolts.
 

3. Multi-floor Building System
The steel structure could be designed for multi-floors, according to the requests from clients ,such as office building,hotel building and so on.Then the steel structure building will have mezzanine floors.The up floors will be designed according to the purpose and load ability.Usually,the mezzanine floor will be made of galvanized steel support board the filled with reinforced concrete.And some steel structure need bridge crane ,especially for factory building or warehouse building.The requests will be satisfied too.
4. Roof system includes roof cladding panel, ventilator  and day light system.

Prefabricated Steel Structure Poultry/Chick Shed/Car Port/Ware House/Workshop


Engineering Design Software: 
AutoCAD, PKPM, MTS, 3D3S, Tarch,Tekla Structures(Xsteel)V12.0.etc

An satisfactory drawing will be designed after the following information offered.

1 Location (where will be built? ) _____country, area
2 Size: Length*width*height _____mm*_____mm*_____mm
3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. Snow height)____kn/m2, _____mm
5 anti-earthquake _____level
6 brickwall needed or not If yes, 1.2m high or 1.5m high
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quanity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m

Prefabricated Steel Structure Poultry/Chick Shed/Car Port/Ware House/Workshop





Prefabricated Steel Structure Poultry/Chick Shed/Car Port/Ware House/WorkshopPrefabricated Steel Structure Poultry/Chick Shed/Car Port/Ware House/Workshop
Prefabricated Steel Structure Poultry/Chick Shed/Car Port/Ware House/WorkshopPrefabricated Steel Structure Poultry/Chick Shed/Car Port/Ware House/Workshop
Prefabricated Steel Structure Poultry/Chick Shed/Car Port/Ware House/Workshop

Prefabricated Steel Structure Poultry/Chick Shed/Car Port/Ware House/WorkshopPrefabricated Steel Structure Poultry/Chick Shed/Car Port/Ware House/Workshop

Prefabricated Steel Structure Poultry/Chick Shed/Car Port/Ware House/Workshop
Prefabricated Steel Structure Poultry/Chick Shed/Car Port/Ware House/Workshop
Prefabricated Steel Structure Poultry/Chick Shed/Car Port/Ware House/Workshop


Payment Terms:

1) Payment: L/C or by T/T(30% by T/T in advance as the deposit, the balance 70% before shipment)
2) Delivery time: 15~40 days, usually as customers' order
3) Shipment: 20'GP, 40"GP, 40'HQ, 40'OT or in bulk




 

    Contact us

    Please feel free to give your inquiry in the form below We will reply you in 24 hours